Construction of Railway Over Bridge (R.O.B.) on Mata Mandir Road (Dharampur Chowk to Bypass Road), Dehradun.

Location

  • District: Dehradun, Uttarakhand
  • Road Stretch: Dharampur Chowk to Bypass Road (Mata Mandir Road)
  • Railway Crossing: Level Crossing No. 41-B/2E (approx. Km 2)
  • The project lies in a densely populated urban area connecting Ajabpur, Mata Mandir Colony, and surrounding residential localities.

Background and Problem Statement

The existing level crossing on the route experiences heavy traffic congestion due to frequent railway movement. During train operations, the gate closure causes long traffic queues, delays, and safety risks for commuters. The road serves as an important urban connector and carries high local traffic volume, making uninterrupted movement essential.

Project Concept and Need

The proposed project involves construction of a Railway Over Bridge (R.O.B.) to eliminate delays caused by the level crossing. The project has been identified under the Setu Bandhan Programme as per government directives. The bridge will provide grade-separated movement, ensuring smooth and safe traffic flow.

Key Components and Features

  • Two-lane Railway Over Bridge
  • Railway span of approximately 48 m clear span
  • Total bridge length approximately 52 m
  • RCC wall-type piers with pile foundation
  • Expansion joints and approach structures
  • Alignment along existing Mata Mandir Road corridor

High-Impact Features

  • Removal of traffic bottleneck at railway crossing
  • Continuous traffic movement without railway interruption
  • Improved road safety for vehicles and pedestrians
  • Enhanced urban mobility in a densely populated zone
  • Future-ready infrastructure supporting traffic growth

Beneficiaries and Coverage

  • Local residents of Dharampur, Ajabpur, Mata Mandir Colony, and nearby areas
  • Daily commuters and commercial vehicles
  • Emergency services (ambulance, fire services, etc.)
  • Tourists visiting Dehradun and adjoining hill destinations

Expected Benefits and Outcomes

  • Significant reduction in traffic congestion and waiting time
  • Improved travel efficiency and fuel savings
  • Reduced accident risk at railway crossing
  • Better connectivity within Dehradun city
  • Enhanced accessibility for tourists, supporting tourism-related movement and local economic activity
  • Improved overall urban transport experience

Implementation Plan / Next Steps

  • Completion of land acquisition process
  • Finalization of DPR and technical approvals
  • Utility shifting and site clearance
  • Tendering and contractor appointment
  • Construction of foundation, piers, and superstructure
  • Development of approach roads and finishing works
  • Testing, inspection, and commissioning

Current Status of the Project

  • First stage approval obtained
  • General Arrangement Drawing (GAD) approved
  • Public hearing for land acquisition completed
  • Land acquisition and DPR preparation processes under progress

Conclusion

The proposed Railway Over Bridge on Mata Mandir Road is a critical infrastructure intervention aimed at resolving long-standing traffic congestion and safety issues caused by the existing railway crossing. The project will improve mobility, support urban development, and enhance connectivity for residents and tourists alike, contributing to sustainable transport infrastructure in Dehradun.