Under the state Sector, work of reconstruction and strengthening of Sainji Lagga Kujoun Maikot Motor Road
Location
The Project is located in the Dasholi development block of district Chamoli, Uttarakhand. it falls under the Badrinath Legislative Assembly constituency and the Pauri Garhwal Lok Sabha constituency. The specific stretch covers Kilometres 1 to 10.090 of village road.
Background and Problem Statement
This road originates from km 11 of Lisa Factory Gopeshwar Dewarkhadora motor road (MDR) and traverses through PMGSY Road with a length of 6.00km, it meets the Math-Jhadeta Motor Road at km 6.300 after a 4.00 km long THDC road it meets NH-07 at Pipalkoti. The road was constructed by PMGSY in a length of 10.090 km. Presently, this section has been taken Due to last year\'s natural calamity, Km 05, Km 07 and Km 10 of the road have suffered extensive damage and traffic on the road has become unsafe.
Project Concept and Need
The project is conceived to upgrade and strengthen the existing 10.090 kilometres stretch of the Road to ensure all-weather driveability and safety. The project will be an alternative route to National Highway 07. In case of blockage of National Highway 07 during the rainy season, Chardham Yatra was conducted through this route.
Key Components and Features
The project involves the Reconstruction and strengthening of the road surface. Key technical components include:
-
Pavement Strengthening: Application of Premix carpet (PC) to provide a durable and smooth riding surface.
-
Base Repair: Laying of Water Bound Macadam (WBM G1, G2, G3) where necessary to stabilize the base.
-
Drainage and Protection: Construction of surface drains, walls and cross-drainage works to prevent waterlogging and road damage.
-
Road Safety Infrastructure: Installation of necessary road furniture, signage, and safety features to ensure commuter safety.
High-Impact Features:
This project is strategically significant as it directly supports the eco-tourism circuit of the Char Dham Yatra.
Beneficiaries and Coverage
The direct beneficiaries of this project include the residents of 11 villages along the alignment, with a total registered population of 10000 (as per the provided data). Key villages include Kujoun, Maikot, Ghingran, Dungree, Dewarkhadora, Kana, Bajani, Khandara, Bemaru, Math Jadeta and Syun will benefit significantly.
Expected Benefits and Outcomes
-
Improved Connectivity: It improves connectivity between National Highway 107 A and National Highway 07.
-
Tourism Boost: Enhanced accessibility to the Char Dham Yatra.
-
Economic Growth: Improved road conditions will encourage the development of local resorts and homestays, generating employment for local residents.
-
Safety: The rectification of the damaged surface and installation of road safety furniture will significantly reduce accident risks.
-
Local Convenience: Easier and faster commute for the local population to markets and essential services.
Current Status of the Project
The project proposal has been prepared with a detailed estimate.
Estimated Cost: ₹ 698.60 Lakhs (₹ 6.98 Crore).
Land Status: The land is already under the possession of the Public Works Department (PWD), as it involves the strengthening of a pre-existing paved road.
Road Safety Audit: The road safety audit has been conducted and incorporated.
Implementation Plan / Next Steps
The project proposed for execution with an estimated completion timeline of 12 months following administrative and financial sanctions. The immediate next steps involve obtaining the necessary financial approvals and initiating the tendering process.
Conclusion
The Reconstruction and strengthening of this road from Km 01 to Km 10.090 is a high-priority infrastructure intervention. By closing the gap in road quality along this road, the project will not only restore a critical transport lifeline but also unlock the economic potential of the region through enhanced tourism and local trade.