Skip to content

Widening To 2 Lane Configuration Of NH-309 B (Almora-Panar) from Km 0.0 to Km 77.10 In The State Of Uttarakhand

Location

The proposed project involves the widening and upgradation of National Highway 309B to a standard two-lane configuration. The highway stretches over a length of 77.100 km, beginning at Km 202 of National Highway 309A at Shail Bend in Almora District and terminating at Km 7 of National Highway 309A in Panar, marking the border between Almora District and Pithoragarh District. This strategic corridor establishes crucial connectivity between Almora and the border areas of Pithoragarh, linking key regions of Uttarakhand and strengthening the transportation network within the state.


Background and Problem Statement

National Highway 309B (NH-309B) serves as a crucial transportation link in the Kumaon region, connecting Almora with a network of surrounding towns, villages, religious sites, and economic centers. The highway begins at Sail Band in Almora and passes through a series of settlements, including Chitai, Petsal, Barechhina, Panuwanaula, Artola, Danya, Dhyari, and ultimately reaches Panar Bridge. However, the existing road section presents significant challenges in its current form. The narrow and sub-standard carriageway traverses hilly and undulating terrain, marked by sharp curves and steep gradients, which present both safety hazards and travel inefficiencies. The road’s constrained right-of-way further complicates its ability to accommodate the growing traffic volumes, including tourist vehicles, commercial transport, and local traffic. As a result, frequent congestion, long travel times, and safety concerns are prevalent, particularly during peak tourist seasons and adverse weather conditions.

Jageshwar Dham Chitai Golu Devta Temple

Project Concept and Need

The existing stretch of National Highway 309B predominantly comprises a single-lane carriageway with sub-standard geometric features, traversing hilly and undulating terrain. In recognition of the strategic and functional importance of NH-309B in providing regional, inter-district, and border connectivity, there is an urgent need to upgrade the corridor to a minimum two-lane standard with paved shoulders. Accordingly, the proposed project envisages the widening and upgradation of NH-309B incorporating improved geometric design, pavement strengthening, drainage improvements, slope stabilization measures, and road safety provisions. The implementation of the project is expected to enhance capacity, safety, riding quality, and operational efficiency, while ensuring long-term sustainability and resilience of the highway in the challenging hill terrain.

Key Components and Features

The proposed project aims to upgrade NH-309B to a standard two-lane configuration with paved shoulders, addressing growing traffic demand, regional development needs, and the corridor’s strategic importance for tourism, local connectivity, and inter-district movement. The scope of work includes widening and strengthening the carriageway, improving horizontal and vertical alignment, and implementing grade improvement works over critical stretches to ensure safe and efficient vehicular movement.

Given the hilly terrain, the project includes slope stabilization measures to mitigate landslides, soil erosion, and other geotechnical hazards. Existing bridges, minor structures, and culverts along the corridor will be strengthened, widened, or reconstructed to comply with the proposed two-lane standard and ensure structural safety. Road safety enhancements, including reflective signage, road markings, guardrails, and crash barriers, will be implemented in accordance with IRC guidelines to improve visibility, sight distance, and operational safety, particularly at curves, hill crests, and accident-prone sections.

Beneficiaries and Coverage

The proposed project encompasses the widening, strengthening, and geometric improvement of NH-309B, including enhancement of horizontal and vertical alignments and grade improvement works over identified critical stretches. Integral components of the project, including drainage improvements, slope stabilization measures, and pavement rehabilitation, are designed to ensure the long-term structural performance and resilience of the highway against landslides, erosion, and other climatic or geotechnical hazards.

The upgraded corridor is expected to benefit a wide spectrum of users. Local communities will gain improved access to markets, healthcare, educational institutions, and employment opportunities, thereby enhancing their socio-economic well-being. Tourists and pilgrims will benefit from safer and faster access to prominent destinations such as Chitai Golu Devta Temple and Jageshwar Dham, contributing to the growth of tourism and related economic activities.

By addressing both infrastructure deficiencies and regional development needs, the project ensures that NH-309B becomes a safe, reliable, and resilient corridor, promoting sustained socio-economic growth and improved accessibility across the Kumaon region of Uttarakhand.

Expected Benefits and Outcomes

Upon completion, the upgraded NH-309B corridor is expected to deliver substantial improvements in travel comfort, road safety, and operational efficiency for all categories of road users, including local residents, tourists, pilgrims, commercial vehicles, and emergency services. The two-lane carriageway with paved shoulders, improved geometric alignment, strengthened pavement, and enhanced drainage and slope protection measures will facilitate safer and more reliable movement, even under adverse weather conditions, thereby reducing travel time and vehicle operating costs.

The project is also expected to have a significant socio-economic impact in the region. By improving connectivity between Almora, Panar, and Pithoragarh, the highway will enhance access to markets, educational institutions, healthcare facilities, and employment centers, while simultaneously promoting tourism through safer and faster access to destinations such as Chitai Golu Devta Temple and Jageshwar Dham. In addition, the upgraded corridor will strengthen the overall highway network of Uttarakhand, improving inter-district and border connectivity and supporting emergency and defense logistics in strategically sensitive areas.

Current Status of the Project

The project is currently at the stage of preparation of the Detailed Project Report (DPR) for the widening of NH-309B (Almora–Panar) to a standard two-lane configuration in the State of Uttarakhand. The consultancy services for the preparation of the DPR have been sanctioned by the Ministry of Road Transport and Highways (MoRTH) under ANNUAL PLAN 2023-24 ,dated 14.11.2024, of amount of Rs. 119.00 lakh.

The alignment for converting the existing motor road to a two-lane configuration has been formally approved by MoRTH, on dated 30.01.2026. Upon completion and approval of the DPR, the project will progress to the tendering stage, followed by award of work and commencement of construction activities.

Conclusion

The proposed project for the widening and upgradation of NH-309B from Almora to Panar to a standard two-lane configuration with paved shoulders is a strategically significant infrastructure intervention aimed at addressing the existing geometric deficiencies, sub-standard carriageway, and capacity constraints of the corridor. The project is designed to enhance road safety, operational efficiency, and travel reliability, particularly in the hilly and undulating terrain of the Kumaon region, which currently poses challenges for vehicular movement and transportation of goods.The project will also strengthen inter-district and border connectivity, supporting emergency response, defense logistics, and strategic mobility in sensitive areas.

View Kml on Map