Improvement Work of Chandak-Maila-Tadigaon Motor Road.

Location

The project is located in District Pithoragarh, Uttarakhand. The proposed motor road starts from km 01 of Chandak-Moshtamanu-Chheda (ODR) Motor Road and it joins Puneri-Tadigaon Motor Road at km 05.

Background and Problem Statement

This motor road is currently a Unpaved (Kuccha) Motor Road. Presently the construction work of integrated building for Automated Driving Testing Trek & Automated Fitness Centre is underway by the Transport Department in the area adjacent to the motor Road.

Project Concept and Need

The project Comprises of Stage II (Walls and Drainage) and improvement work. In view of the significant increase in the importance of the said motor road resulting from the project undertaken by the transport department, improvement of the motor road has become necessary. These development have led to a rise in traffic volume, including commercial and commuter movement, thereby placing additional demand on the existing road infrastructure. In order to ensure safe, efficient and uninterrupted movement of vehicles, it has become necessary to improve and upgrade the road in line with the current and anticipated traffic requirements.

Key Components and Features

The proposed road improvement includes key components and features aimed at enhancing safety, capacity and riding comfort. These comprise strengthening and improvement of pavement structure and provision of adequate drainage. The project also includes construction of parapets to ensure safe movement.

  • Capacity Augmentation: Capacity augmentation of the road is proposed to accommodate the increased traffic demand arising from surrounding developments. The improvement works include strengthening of carriageway, enhancement of drainage and safety. These measures will increase the road’s carrying capacity, improve level of service and ensure safe and efficient movement of vehicles.

  • Strategic Alignment: The road holds strategic importance due to its alignment, as it serves as a vital alternate route providing access from Medical college to the Base Hospital and other key activity centres. This alignment plays a critical role in ensuring uninterrupted movement of emergency vehicles, public traffic, and essential services, particularly during peak hours or in the event of disruptions on primary routes.

  • Connectivity: The road provides important connectivity by serving as an alternate route to the primary access road.

Beneficiaries and Coverage

The beneficiaries of the road improvement include local residents, daily commuters, emergency service vehicles, patients accessing the Base Hospital, Medical college and commercial and service traffic using the route as an alternate corridor.

Expected Benefits and Outcomes

  • Improved connectivity by providing a reliable alternate route to the existing road network.
  • Reduction in traffic congestion and travel time on the primary access roads.
  • Enhanced access to essential facilities, including the Base Hospital and Medical college especially for emergency services.
  • Improved road safety, riding comfort, and traffic management.
  • Support for local development and smoother movement of residential and commercial traffic.
  • Economic Growth: The road will also improve accessibility to key institutions and employment centers, thereby promoting investment, boosting local trade, and supporting overall socio-economic development of the surrounding area.

Current Status of the Project

The estimated cost for the project is ₹ 399.74 Lakhs

Implementation Plan / Next Steps

The road improvement work shall be executed by the Public Works Department in accordance with applicable PWD specifications, IRC standards, and departmental guidelines. The implementation shall commence with detailed site survey, verification of alignment and Right of Way and preparation of detailed estimates and drawings. Necessary approvals shall be obtained prior to execution. The work shall be taken up through approved tendering procedures. Construction activities shall include strengthening and widening of the carriageway, improvement of pavement crust, drainage works, construction of shoulders, and provision of road safety measures. Traffic management and safety arrangements shall be maintained during execution. Upon completion, the work shall be inspected and certified by the competent authority before opening the road to traffic.

Conclusion

In view of the strategic importance of the road, its role as an alternate route, and the increased traffic demand due to surrounding developments, the proposed improvement is both necessary and justified. The project will enhance connectivity, safety, and capacity, ensure reliable access to essential facilities such as the Base Hospital, Medical college and contribute to overall socio-economic development of the area.