Strengthening of the Chakrata-Lakhamandal Motor Road (State Highway 18) from Chainage 45.00 to Chainage 65.340 with DBM/BC overlay.
Location
- District: Dehradun
- Constituency: Chakrata
- Road: Chakrata-Lakhamandal Motor Road (State Highway 18)
Background and Problem Statement
The section of State Highway 18 between Chainage 45.000 and Chainage 65.340 is in a severely dilapidated condition. A significant portion of this road (Chainage 45.000 to Chainage 52.000) is currently unmetalled (kuchha), leading to extremely poor road conditions during the monsoon, including mud, slipperiness, and waterlogging. The remaining sections, which were previously paved, have suffered extensive damage, resulting in numerous potholes, cracks, and an uneven surface. This deterioration causes major difficulties for all types of vehicles, including tourist buses and heavy transport, leading to traffic disruptions, increased travel time, and a high risk of accidents, especially at night and during rains. The poor state of the road adversely affects tourism and hampers the timely delivery of emergency services.
Project Concept and Need
This project is aimed at the comprehensive strengthening and improvement of this critical 19.840 km section of SH-18. The need arises from the urgent requirement to provide safe, all-weather connectivity to the region, which is significant for tourism and local livelihoods. By strengthening the road, the project intends to enhance its load-carrying capacity, improve safety, and ensure smooth traffic flow. This will make the tourist and pilgrimage sites in the Chakrata-Lakhamandal area more accessible, boosting the local economy and facilitating better access for local farmers to transport their produce.
Key Components and Features
The project involves a wide range of construction and strengthening activities:
- Roadbed Preparation: Extensive grading and preparation of the road foundation.
- Pavement Work: Application of a Prime Coat followed by layers of Dense Bituminous Macadam (DBM) and Bituminous Concrete (BC).
- Drainage System: Construction of both unlined (
kuchha) and lined (pucca) drains, along with cross-drainage structures to manage water flow. - Protective Structures: Construction of retaining walls and breast walls to stabilize slopes and protect the road.
- Safety and Finishing: Shoulder dressing, application of thermoplastic road paint, and installation of safety features like road delineators, vertical guide posts, and road studs (cat's eyes).
Special Features
This is a major road enhancement project in a strategic tourism and pilgrimage corridor. It will not only improve the road surface but also includes comprehensive slope protection and drainage works, making the road more resilient and safer for travel in a hilly region. The project will significantly boost the socio-economic development of the area by improving access and reducing travel time.
Beneficiaries and Coverage
The project will benefit a wide range of stakeholders:
- Tourists and Pilgrims: Providing safer and more comfortable access to destinations in the Chakrata-Lakhamandal region.
- Local Residents and Farmers: Enabling easier transport of local agricultural and horticultural produce to markets, thereby increasing income.
- Commercial and Public Transport: Ensuring smoother operation of buses, taxis, and heavy vehicles.
Expected Benefits and Outcomes
- Improved Safety and Comfort: A strengthened and smooth road surface will lead to a significant reduction in accidents and a more comfortable journey.
- Increased Load Carrying Capacity: The road will be able to handle heavy and tourist vehicle traffic more efficiently.
- Boost to Tourism: Better access will promote tourism activities, leading to growth in local businesses like hotels, homestays, and handicraft sales.
- Economic Growth and Reduced Migration: Increased employment opportunities from tourism and better market access for farmers will help in curbing migration and will boost the regional economy.
- Guaranteed Emergency Access: Ensures timely and safe passage for critical services like ambulances, disaster management, and administrative vehicles.
Current Status of the Project
Not specified in the document. The land is noted to be under the ownership of the Public Works Department.
Implementation Plan / Next Steps
The project will be executed by the Temporary Division of the Public Works Department, Chakrata.
Conclusion
The strengthening of the Chakrata-Lakhamandal road is a project of immense strategic importance for the Dehradun district. It addresses long-standing issues of poor connectivity and road safety in a region with high tourism potential. The project will serve as a catalyst for socio-economic development, unlock economic opportunities for local communities, and provide a safe and reliable transportation artery for residents and visitors alike.
Figure 1: Location Map


Site Photographs
![]() |
![]() |

