Skip to content

Widening of Dehradun-Kimadi- Lambidhar- Motilal Nehru- Cart Maccanzi- Mussoorie Motor Road (SH-79) in Dehradun

Location

The project is located in the Dehradun city of District Dehradun, Uttarakhand. The specific stretch for widening is from Supply Chowk to Baasagaad via Kimadi.

Background and Problem Statement

The existing road from Supply Chowk to Gattikhola (Km. 2) having length 2.00 Km is 2 lane & Gattikhola to Baasagaad having length 22 Km. is single lane. Due to large influx of pilgrims, tourists and devotees travelling towards Mussoorie/Yamunotri, traffic increases significantly, resulting in frequent and prolonged traffic jams in specific stretch being intermediate/single lane i.e Supply Chowk to Baasagaad. The surface condition is very poor, causing considerable inconvenience to commuters and hindering smooth vehicular movement.

Project Concept and Need

The 24 Km of this stretch is in single lane passes through hilly region which is heavily congested with traffic. This stretch is constantly jammed causing inconvenient to the local public, pilgrims, tourists etc. Widening of the road will reduce the traffic pressure which will ensure safe, smooth and uninterrupted traffic.

Key Components and Features

The project involves the comprehensive widening and strengthening of the road surface using modern bituminous technologies. Key technical components include:

  • Hill Side Cutting: 3-4M extra hill side cutting.
  • Construction of R/Wall and B/Walls: Walls proposed in necessary places as per design.
  • Drainage and Protection: Construction of surface drains and cross-drainage works to prevent waterlogging and road damage.
  • Road Safety Infrastructure: Installation of necessary road furniture, signage, and safety features to ensure commuter safety.

High-Impact Features

This project is strategically significant as it directly support the tourism circuit of the Dehradun to Mussoorie and Yamunotri Dham. It enhances the tourism potential of the entire region.

Beneficiaries and Coverage

The direct beneficiaries of this project Along with the local residents, tourists coming to the state for Char Dham Yatra will also be able to reach their destination in less time.

Expected Benefits and Outcomes

  • Improved Connectivity: Seamless travel experience between Dehradun Mussoorie and Yamnotri Dham
  • Tourism Boost: Enhanced accessibility to the Himanchal State is expected to increase tourist footfall.
  • Economic Growth: Improved road conditions will encourage the development of local resorts and home stay, generating employment for local residents.
  • Safety: The rectification of the damaged surface and installation of road safety furniture will significantly reduce accident risks.
  • Local Convenience: Easier and faster commute for the local population to markets and essential services.

Implementation Plan / Next Steps

The implementation is planned under State Sector sanction. Next steps involve:

  • Obtaining cutting permission of trees from Forest Deptt.
  • Obtaining necessary administrative and financial sanctions.

Current Status of the Project

The project feasibility survey work has been completed.

  • Estimated Cost: Approximately. ₹ 14.50 Cr. DPR send to Govt. for sanction.
  • Land Status: The land is under the possession of PWD in 12M width & Approx.1100 Nos. trees affected in widening into Intermediate lane.

Conclusion

In order to regulate and decongest traffic for tourists,pilgrims & commuters proceeding towards Mussoorie/Yamunotri, the Dehradun Mussoorie motor road (SH-1) using this specific stretch from Single Lane into Intermediate Lane (From Km 1 to Km 24) of Dehradun-Kimadi-Lambidhar-Motilal Nehru-Cart Maccanzi-Mussoorie. This project will not only restore a critical transport lifeline but also unlock the economic potential of the region through enhanced tourism and local trade and also will solve the problem of traffic jams and will the reduce the possibility of accidents.

View Kml on Map

Figure: Location Map