Skip to content

widening of road from GABA Check to DD Chowk (Kashipur Bypass) in Rudrapur city

(Under Hon'ble Chief Minister's Declaration No. 203/2017)

Location

The project is located in District Udham Singh Nagar, Uttarakhand. The specific stretch for widening is from GABA Check to DD Check (Kashipur Bypass) in Rudrapur city.

Background and Problem Statement

The road stretch from GABA Chowk to DD Chowk (Kashipur Bypass) in Rudrapur is a critical urban corridor. Due to its strategic importance in decongesting city traffic, the stretch experiences heavy traffic pressure and a high volume of vehicular movement throughout the day. It serves as a vital link connecting internal city roads to the Kashipur Bypass and functions as an alternative route to reduce congestion within the city limits.

Project Concept and Need

Considering the increasing traffic demand, the road requires upgradation to a three-lane carriageway with paved shoulders on both sides to ensure smooth traffic flow, improve road safety, and reduce congestion. The proposed widening will significantly enhance the carrying capacity of the road and support future traffic growth.

Key Components and Features

The project involves the widening of a 1.28 km long stretch of the existing GABA Chowk to DD Chowk (Kashipur Bypass).

  • Capacity Augmentation: Conversion of the existing carriageway into a three-lane carriageway with paved shoulders on both sides.
  • Strategic Alignment: to ensure smooth traffic flow, improve road safety, and reduce congestion. The proposed widening will significantly enhance the carrying capacity of the road and support future traffic growth.
  • Connectivity: Functions as a bypass route for the District Headquarters and facilitates inter-city movement.
  • Right of way: ROW varies 24.00 mtr.

Beneficiaries and Coverage

The beneficiaries include:

  • Tourists: Visitors traveling from other states to Uttarakhand.
  • Pilgrims: Devotees visiting major shrines in the Kumaon region.
  • Local Residents & Students: Facilitating easier daily commute.
  • Farmers: Providing better access to transport agricultural produce to the mandis (markets).

Expected Benefits and Outcomes

  • Enhanced Tourism: Improved road infrastructure will boost tourism by providing a comfortable travel experience for visitors entering from Uttar Pradesh.
  • Reduced Congestion: Widening to three-lane carriageway with paved shoulders on both sides will significantly alleviate traffi- pressure and reduce travel time.
  • Economic Growth: Better connectivity for farmers to markets will support the local agricultural economy.
  • Improved Safety: A wider, well-planned road will enhance safety for all road users.

Current Status of the Project

The estimated cost for the project is structured in two phases: -Phase 1: Estimated at ₹291.41 Lakhs. -Phase 2: Estimated at ₹950.00 Lakhs.

Implementation Plan / Next Steps

The implementation is planned in two phases as per the cost estimates provided. Further steps would involve obtaining administrative and financial sanctions for the estimated amounts and proceeding with the tendering process.

Conclusion

The widening of the GABA Chowk to DD Chowk (Kashipur Bypass) Road in Rudrapur is a high-impact infrastructure initiative for District Udham Singh Nagar. By upgrading this key arterial route to a three-lane carriageway with paved shoulders, the project will address critical traffic bottlenecks, enhance regional connectivity, support tourism and agriculture, and strengthen overall urban mobility in the region.

View Kml on Map

Figure: Location Map

Site Photograph

Proposed X-Section