Rehabilitation and Up-gradation to 4-Lane from Chainage 5.735 to Chainage 24.000 (Kashipur–Ramnagar) of NH-309

Location

The project stretch is located in Udham Singh Nagar and Nainital districts of Uttarakhand, extending from Kashipur (Chainage 5.735) to Ramnagar (Chainage 24.000). This corridor connects the industrial and urban areas of Kashipur with Ramnagar, which serves as the gateway to Jim Corbett National Park and adjoining tourist destinations. The alignment passes through semi-urban, rural, and forest-influenced areas.

Background and Problem Statement

NH-309 is a vital arterial highway catering to industrial traffic, tourist movement, and daily commuter flow between Kashipur and Ramnagar. The existing two-lane highway is experiencing capacity constraints due to rapid industrial growth in Kashipur, increasing tourism traffic towards Corbett National Park, and ribbon development along the corridor. Congestion, frequent intersections, mixed traffic, and inadequate road width have resulted in reduced level of service, increased travel time, and safety concerns. Pavement distress and inadequate drainage further aggravate operational inefficiencies, particularly during monsoon periods.

Project Concept and Need

The project has been conceptualized to upgrade the existing highway to a 4-lane divided carriageway in accordance with IRC and MoRTH standards. The need for the project arises from increasing traffic demand, requirement for improved safety and mobility, and the strategic importance of the corridor for industrial, tourism, and regional development. The upgradation will ensure smooth traffic flow, enhanced safety, and long-term sustainability of the highway infrastructure.

Key Components and Features

  • Widening of the existing carriageway to 4 lanes with median.
  • Strengthening and rehabilitation of pavement structure.
  • Improvement of horizontal and vertical geometry.
  • Junction improvements and access management.
  • Provision of service roads at built-up locations, wherever required.
  • Adequate drainage arrangements including side drains and cross-drainage works.
  • Road safety measures such as crash barriers, signage, road markings, lighting, and pedestrian facilities.
  • Environmental protection and mitigation measures in forest-influenced stretches.

Beneficiaries and Coverage

The project will benefit:

  • Local residents of Udham Singh Nagar and Nainital districts.
  • Industrial and commercial establishments in and around Kashipur.
  • Tourists and pilgrims visiting Ramnagar and Jim Corbett National Park.
  • Commercial transport operators and logistics services. The project covers a total length of approximately 18.265 km of NH-309.

Expected Benefits and Outcomes

  • Reduction in travel time and vehicle operating costs.
  • Improved road safety and reduction in accident rates.
  • Enhanced connectivity supporting industrial growth and tourism.
  • Improved riding comfort and traffic flow.
  • Strengthened regional and economic development.

Current Status of the Project

Overall, the Rehabilitation and Up-gradation to 4-Lane from Chainage 5.735 to Chainage 24.000 (Kashipur–Ramnagar) of NH-309 has achieved significant milestones with the sanction of the DPR amounting to Rs. 494.45 crore and steady progress in tendering, land acquisition, and forest clearance activities. Resolution of the identified land acquisition issues and expeditious processing of forest clearance proposals will facilitate timely award and execution of the project, thereby strengthening road connectivity, safety, and socio-economic development in the Kumaon region of Uttarakhand.

Implementation Plan / Next Steps

  • Completion of remaining land acquisition formalities and disbursement of compensation.
  • Further processing and approval of forest clearance proposal.
  • Finalization of tendering and award of construction works.
  • Execution of construction in a phased and time-bound manner with due attention to safety and environmental safeguards.

Conclusion

The rehabilitation and up-gradation of NH-309 from Kashipur to Ramnagar into a 4-lane corridor will significantly enhance capacity, safety, and efficiency of this important highway. The project will reduce travel time and transportation costs, improve safety for road users, and support industrial growth, tourism development, and regional connectivity in Uttarakhand. Overall, the project represents a critical infrastructure intervention aligned with the long-term development objectives of the Ministry of Road Transport & Highways.