Widening of Gadarpur - Milkham Road (ODR) from 1.5 - Lane to 2-Lane
Location
The project is located in District Udham Singh Nagar, Uttarakhand. The specific stretch for Widening of Gadarpur -- Milkham Road
Background and Problem Statement
This road stretch is a critical Other District Road connecting Uttarakhand with Uttar Pradesh. It witnesses heavy traffic pressure due to its strategic importance for tourism, religious pilgrimage, and inter-state connectivity. The current 1.5-lane configuration is insufficient to handle the high volume of vehicular movement, necessitating an upgrade to ensure smooth traffic flow and reduce congestion. A two-lane road has already been constructed by the PWD, Uttar Pradesh, up to the Uttarakhand border.
Project Concept and Need
The project is conceived to upgrade the existing 1.5-lane road to a 2-lane highway to accommodate increasing traffic density. The primary objective is to facilitate seamless travel for tourists, pilgrims, and local commuters, ensuring efficient connectivity between the state border and major destinations within Uttarakhand.
Key Components and Features
The project involves the widening of a 9.400 km long stretch of the existing State Highway No. 13.
- Capacity Augmentation: Conversion of the existing 1.5-lane carriageway into a 2-lane divided carriageway.
- Strategic Alignment: The route serves as a vital link connecting to key religious and tourist sites in the Kumaon region, including Kainchi Dham, Jageshwar Temple, and Golu Devta Temple.
- Connectivity: It acts as a primary connector for the District Headquarters.
- Right of way: ROW varies 16.00 mtr.
Beneficiaries and Coverage
The beneficiaries include:
- Tourists: Visitors traveling from other states to Uttarakhand.
- Pilgrims: Devotees visiting major shrines in the Kumaon region.
- Local Residents & Students: Facilitating easier daily commute.
- Farmers: Providing better access to transport agricultural produce to the mandis (markets).
Expected Benefits and Outcomes
- Enhanced Tourism: Improved road infrastructure will boost tourism by providing a comfortable travel experience for visitors entering from Uttar Pradesh.
- Reduced Congestion: Construction of 2 lane will significantly alleviate traffic pressure and reduce travel time.
- Economic Growth: Better connectivity for farmers to markets will support the local agricultural economy.
- Improved Safety: A wider, well-planned road will enhance safety for all road users.
Current Status of the Project
The estimated cost for the project is structured in two phases:
- Phase 1: Estimated at ₹30.96 Lakhs.
- Phase 2: Estimated at ₹1150.00 Lakhs.
Implementation Plan / Next Steps
The implementation is planned in two phases as per the cost estimates provided. Further steps would involve obtaining administrative and financial sanctions for the estimated amounts and proceeding with the tendering process.
Conclusion
Construction of an ROB in lieu of a level crossing is essential for safe, fast, and efficient transportation, especially on high-traffic corridor.
Figure 1: Line Plan

Figure 1: Location Map

Site Photographs
![]() |
![]() |

