ID :1585
स्वतंत्रता संग्राम सैनानी ”वृक्ष मानव“ श्री विश्वेश्वर दत्त सकलानी मोटर मार्ग कि0मी0- 12 है0मी0 0-2
on Chainage 11.075 of Freedom fighter Shri Vishveshwar Dutt Saklani motor road (Raipur Kaddukhal state highway)
In District Tehri Under TD Thatyur Division
Critical Report on Bridge Condition
Form Filled By Surendra Kumar [90007790]
Inspection Team
Detail Report
| # | Parameter | Problem ? | How Bad? | How Much? | |
|---|---|---|---|---|---|
| 1 | ROAD APPROCHES AND DECK Component Weightage 10 | ||||
| A- ROAD SURFACE NEAR BRIDGE | |||||
| a) Bumpy road surface near bridge? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- DRAINAGE | |||||
| a) Badly built road drainage near bridge? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Blocked or damaged road drains? | Yes | Not So Bad | Some Qty | 2 | |
| c) Water on the deck? | Yes | Bad | Not Much Qty | 4 | |
| d) Blocked or damaged deck drains? | Yes | Very Bad | Much Qty | 9 | |
| C- WEARING COAT | |||||
| CONCRETE WEARING COURSE | |||||
| a) Cracking? | Yes | Very Bad | Some Qty | 8 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement exposed? | Yes | Very Bad | Not Much Qty | 7 | |
| d) Poor concrete? | Yes | Bad | Much Qty | 6 | |
| e) Wear of surface due to small stones? | Yes | Very Bad | Not Much Qty | 7 | |
| D- KERBS & FOOTPATHS | |||||
| a) Loose railing fixtures? | Yes | Very Bad | Some Qty | 8 | |
| a) Damaged or loose kerbs? | Yes | Very Bad | Much Qty | 9 | |
| 2 | PARAPETS, RAILINGS AND CRASH BARRIERS Component Weightage 10 | ||||
| a) Impact damaged? | Yes | Very Bad | Much Qty | 9 | |
| b) Loose or damaged fixings? | Yes | Very Bad | Much Qty | 9 | |
| c) Loose base of posts? | Yes | Very Bad | Some Qty | 8 | |
| d) Damaged coatirig or paint on steel surface? | NO Problem | -- | -- | 0 | |
| e) Corrosion on steel surface? | NO Problem | -- | -- | 0 | |
| f) Cracking on Masonary Parapets? | Yes | Very Bad | Much Qty | 9 | |
| g) Movement or bending of parapet? | NO Problem | -- | -- | 0 | |
| h) Poor pointing/ Plaster on parapet? | NO Problem | -- | -- | 0 | |
| i) Deterioration of bricks or stones? | Yes | Very Bad | Much Qty | 9 | |
| 3 | EXPANSION JOINT AT ABUTMENTS & PIERS Component Weightage 10 | ||||
| a) Damage to concrete of deck end or dirt wall near joint? | Yes | Very Bad | Not Much Qty | 7 | |
| b) Debris or vegetation in joint? | NO Problem | -- | -- | 0 | |
| c) Loose or damaged fixtures? | Yes | Not So Bad | Much Qty | 3 | |
| d) Damage or corrosion to metal parts? | Yes | Not So Bad | Not Much Qty | 1 | |
| e) Damage to rubber waterseals? | Yes | Not So Bad | Not Much Qty | 1 | |
| 4 | RIVER Component Weightage 10 | ||||
| A- BLOCKAGES IN WATERWAY | |||||
| a) Debris against piers or abutments? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Remains of old bridge under or upstream of the bridge? | NO Problem | -- | -- | 0 | |
| c) Fencing or buildings under bridge? | NO Problem | -- | -- | 0 | |
| d) Trees or bushes.growing under bridge? | NO Problem | -- | -- | 0 | |
| B- CHANGE IN RIVER COURSE | |||||
| a) River changing path upstream of bridge? | NO Problem | -- | -- | 0 | |
| b) New islands forming upstream of bridge? | NO Problem | -- | -- | 0 | |
| C- RIVER TRAINING WORKS | |||||
| a) River attack beyond the upstream end of river training works? | NO Problem | -- | -- | 0 | |
| b) Damage to walls? | NO Problem | -- | -- | 0 | |
| c) Loss of pitching? | NO Problem | -- | -- | 0 | |
| d) Damage to crates, timber, fencing, etc.? | NO Problem | -- | -- | 0 | |
| e) Damage to trees? | NO Problem | -- | -- | 0 | |
| 5 | SUPERSTRUCTURE Component Weightage 60 | ||||
| CONCRETE | |||||
| General | |||||
| a) Impact damage to girders, trusses or bracings? | NO Problem | -- | -- | 0 | |
| b) Debris or vegetation on beams, girders, trusses bracings or joints? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Water coming through the deck? | Yes | Very Bad | Some Qty | 8 | |
| d) Water from the deck drainage flowing on to girders, trusses, beams or bracings? | Yes | Very Bad | Not Much Qty | 7 | |
| e) Not enough vertical & horizontal clearances? | NO Problem | -- | -- | 0 | |
| CONCRETE BEAMS | |||||
| a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
| b) Spalling? | Yes | Very Bad | Much Qty | 9 | |
| c) Corrosion of reinforcement? | Yes | Very Bad | Much Qty | 9 | |
| d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
| CONCRETE UNDERSIDE OF DECK | |||||
| a) Cracking? | Yes | Very Bad | Much Qty | 9 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Reinforcement corrosion? | Yes | Very Bad | Much Qty | 9 | |
| d) Poor concrete? | Yes | Very Bad | Much Qty | 9 | |
| e) Less cover to reinforcement? | Yes | Very Bad | Much Qty | 9 | |
| 6 | BEARINGS Component Weightage 10 | ||||
| METAL BEARINGS | |||||
| a) Debris or vegetation around bearings? | Yes | Not So Bad | Some Qty | 2 | |
| b) Bad drainage? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Not enough room for the bridge span to move? | NO Problem | -- | -- | 0 | |
| d) Bearing not seated properly? | NO Problem | -- | -- | 0 | |
| e) Bridge span not seated properly on bearing? | NO Problem | -- | -- | 0 | |
| f) Damaged bedding mortar? | Yes | Not So Bad | Some Qty | 2 | |
| g) Damaged or loose earthquake restraints? | NO Problem | -- | -- | 0 | |
| METAL BEARINGS | |||||
| a) Parts not properly seated? | NO Problem | -- | -- | 0 | |
| b) Parts not free to move? | NO Problem | -- | -- | 0 | |
| c) Problem with the lubrication system? | NO Problem | -- | -- | 0 | |
| d) Sliding surfaces damaged? | NO Problem | -- | -- | 0 | |
| e) Cracks or bends in metal parts/ Bearing? | NO Problem | -- | -- | 0 | |
| f) Corrosion of metal parts? | Yes | Very Bad | Much Qty | 9 | |
| 7 | Right Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Not So Bad | Some Qty | 2 | |
| b) Damage to foundation? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Movement of abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| d) Debris against abutment? | Yes | Not So Bad | Some Qty | 2 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | Yes | Not So Bad | Some Qty | 2 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | Yes | Not So Bad | Not Much Qty | 1 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | NO Problem | -- | -- | 0 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 8 | Left Side ABUTMENT, WING WALLS & RETAINING WALLS Component Weightage 10 | ||||
| A- GENERAL | |||||
| a) Erosion or scour at abutment? | Yes | Not So Bad | Not Much Qty | 1 | |
| b) Damage to foundation? | Yes | Not So Bad | Not Much Qty | 1 | |
| c) Movement of abutment? | NO Problem | -- | -- | 0 | |
| d) Debris against abutment? | Yes | Not So Bad | Some Qty | 2 | |
| e) Vegetation growing on-or in abutment? | NO Problem | -- | -- | 0 | |
| f) Scour near to retaining walls? | NO Problem | -- | -- | 0 | |
| g) Movement of retaining walls? | NO Problem | -- | -- | 0 | |
| h) Water leaking down through the expansion joint? | NO Problem | -- | -- | 0 | |
| B- DRAINAGE SYSTEM | |||||
| a) Not enough weepholes? | NO Problem | -- | -- | 0 | |
| b) Weepholes not working? | NO Problem | -- | -- | 0 | |
| c) Water leaking through the abutment? | NO Problem | -- | -- | 0 | |
| C- CONCRETE WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Spalling? | NO Problem | -- | -- | 0 | |
| c) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
| d) Poor concrete? | NO Problem | -- | -- | 0 | |
| D- MASONRY WALLS | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Bulging? | NO Problem | -- | -- | 0 | |
| c) Poor pointing? | NO Problem | -- | -- | 0 | |
| d) Deterioration of bricks or stones? | NO Problem | -- | -- | 0 | |
| E- EMBANKMENTS AND FILL IN FRONT OF ABUTMENT | |||||
| a) Scour at base of slopes? | NO Problem | -- | -- | 0 | |
| b) Slippage of fill? | NO Problem | -- | -- | 0 | |
| c) Erosion of fill? | NO Problem | -- | -- | 0 | |
| d) Cracking of road or embankment edge? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| 9 | Embankments Component Weightage 10 | ||||
| A- STONE PITCHING SLOPE PROTECTION | |||||
| a) Cracking? | NO Problem | -- | -- | 0 | |
| b) Poor pointing? | NO Problem | -- | -- | 0 | |
| c) Scour or erosion at edge? | NO Problem | -- | -- | 0 | |
| d) Pieces broken off? | NO Problem | -- | -- | 0 | |
| e) Piping failure of fill? | NO Problem | -- | -- | 0 | |
| B- SLOPE PROTECTION WITH CRATES | |||||
| a) Not much movement of crates? | NO Problem | -- | -- | 0 | |
| b) Damage to crates or ties? | NO Problem | -- | -- | 0 | |
| C- PITCHING SLOPE PROTECTION WITH CONCRETE BLOCKS | |||||
| a) Slope getting washed out? | NO Problem | -- | -- | 0 | |
| b) Settlement? | NO Problem | -- | -- | 0 | |
| 10 | RIVER BED Component Weightage 10 | ||||
| A- BED PROTECTION AND APRONS | |||||
| a) Large holes in the river bed? | NO Problem | -- | -- | 0 | |
| b) Loss of material | NO Problem | -- | -- | 0 | |
| c) Crates broken away from pier or abutment? | NO Problem | -- | -- | 0 | |
| d) Damage to wires or ties? | NO Problem | -- | -- | 0 | |
| B- STONE PITCHING OR CONCRETE BED PROTECTION AND APRONS | |||||
| a) Scour at edge? | NO Problem | -- | -- | 0 | |
| b) Cracking? | NO Problem | -- | -- | 0 | |
| c) Spalling or stones missing? | NO Problem | -- | -- | 0 | |
| d) Erosion of surface? | NO Problem | -- | -- | 0 | |
| e) Corrosion of reinforcement? | NO Problem | -- | -- | 0 | |
End of Report