खाडी पिपलेथ उत्खण्डा मोटर मार्ग । (ID: 2535) , निर्माण खण्ड नरेन्द्रनगर , Tehri

# KM Closed On Tentative Date Opened On Response Time Open Type Informed By Initial cost Restoration Cost Damage Type Location Chainages Remark PiC geo location lat lng ID
1 7 2025-07-10 14:32:22 2025-07-10 16:42:00 2025-07-10 16:45:02 2 hours 12 mins Opened Balbir Singh Pundir ,Draftsman ,61004780 0.05 0.00 Slip/ Landslide Slip & Boulders - 8323
2 7 2025-08-07 08:37:11 2025-08-07 13:37:11 2025-08-07 13:50:05 5 hours 12 mins Opened Balbir Singh Pundir ,Draftsman ,61004780 0.03 0.00 Slip/ Landslide slip - 17593
3 7 2025-08-19 07:33:32 2025-08-19 14:50:00 2025-08-19 14:52:19 7 hours 18 mins Opened Mr Satya Prakash ,Assistant Engineer Civil ,61006225 0.12 0.00 Slip/ Landslide Slip - 24437
4 7 2025-08-30 08:00:36 2025-08-30 13:00:36 5 hours 0 mins GAURAV JUYAL ,AE 2024 ,42270313M00188 0.10 0.00 Slip/ Landslide Slip - 29726
5 5 2025-08-07 08:37:11 2025-08-07 13:37:11 2025-08-07 13:49:42 5 hours 12 mins Opened Balbir Singh Pundir ,Draftsman ,61004780 0.03 0.00 Slip/ Landslide slip - 17591
6 6 2025-08-07 08:37:11 2025-08-07 13:37:11 2025-08-07 13:49:50 5 hours 12 mins Opened Balbir Singh Pundir ,Draftsman ,61004780 0.03 0.00 Slip/ Landslide slip - 17592
7 4 2025-08-15 09:23:31 2025-08-15 14:40:00 2025-08-15 14:41:41 5 hours 18 mins Opened Mr Satya Prakash ,Assistant Engineer Civil ,61006225 0.10 0.00 Slip/ Landslide Slip - 22157
8 1 2025-08-30 08:00:11 2025-08-30 13:00:11 5 hours 0 mins GAURAV JUYAL ,AE 2024 ,42270313M00188 0.10 0.00 Slip/ Landslide Slip - 29724
Total: 0.56 0.00

Current Road KM Closures (as on 30 Aug 2025)

KM Tentative Opening Date Status
7 2025-08-30 13:00:36 Closed
1 2025-08-30 13:00:11 Closed
Road is closed at KM 7 (tentative: 2025-08-30 13:00:36), 1 (tentative: 2025-08-30 13:00:11).

Proposed to be open up to: Sat 30 Aug 2025 13:00 (33 minutes 5 seconds from now from now)