Bridge (ID- 3798 ) Inventory Report

Zero Bridge On Chainage 255.968 of Tuyuni Chakrata Mussoorie Chamba New Tehri Maletha national highway

Data finalized On 11 Sep 2025

By Deepak Gusain

Bridge Yet Not Rated

Categorized As

XXXXX on XX-XX-XXXX

In District : Tehri Under Division : NH Srinagar

General

Bridge Type : Motor Bridge High Level
Structure No : 256/1
Feature Intersected : Bhilangna
Name of Bridge : Zero Bridge
Nearest Town : Kyari, Chaunda
Latitude (Northing) : 30.35296800
Longitude (Easting) : 78.48463200
Construction Year : 1985
Inventory Year : 2025

Geometric

Overall length (in meter) : 64.00
Total No of Span : 1
Maximuam Span (in meter) : 64.00
Span Arragment : 1x64
No of Lane : 2.000
Overall Width (m) : 8.000
Carriageway Width (m) : 7.300
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 8.000
Gradient (%age) : 0
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level :
OFL Ordinary Flood Level :
LWL Low Water Level :
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Mild
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : NA

Super-Structure

Superstructure Type : Truss
Superstructure Material : Steel
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Steel rolled section
Bearing type : Elastomeric

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC Box type
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Random Rubble Stone Masonry
Bank Protection Right Side of Up-stream : Random Rubble Stone Masonry
Bank Protection Left Side of Down-stream : Random Rubble Stone Masonry
Bank Protection Right Side of Down-stream : Random Rubble Stone Masonry
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided