Bridge (ID- 2203 ) Inventory Report

Begam Nala On Chainage 37.650 of Purkazi Laksar Haridwar national highway

Data Yet Not Finalized

Last Rated On 10 Jun 2025

Rating 0.50%

Categorized As

XXXXX on XX-XX-XXXX

In District : Haridwar Under Division : NH Dehradun

General

Bridge Type : Motor Bridge High Level
Structure No : 1
Feature Intersected : Begam Nala
Name of Bridge : Begam Nala
Nearest Town : Haridwar
Latitude (Northing) : 29.75767222
Longitude (Easting) : 78.08508611
Construction Year : 2015
Inventory Year : 2022

Geometric

Overall length (in meter) : 20.30
Total No of Span : 1
Maximuam Span (in meter) : 20.30
Span Arragment : 1x20.30
No of Lane : 2.000
Overall Width (m) : 14.000
Carriageway Width (m) : 10.500
RS Footpath Width (m) : 1.000
LS Footpath Width (m) : 1.000
Approch Width i/c Shoulders (m) : 14.000
Gradient (%age) : 3
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 200.000
OFL Ordinary Flood Level : 150.000
LWL Low Water Level : 100.000
Design Velocity (m/Sec) :
Design Discharge (Cumecs) :
Soffit Level at Centre :
Road Level at Centre :
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 1.0
Design Loading : Class A
Load Rating : Class A

Super-Structure

Superstructure Type : T-beam and slab
Superstructure Material : Reinforced concrete
Wearing Coat Type : Cement Concrete
Expension Joint Type : Single Strip/Box Seal Joint
Railing/Crash Barrier type : Cast-in-situ concrete
Bearing type : Roller & Rocker

Sub-Structure

Founding Strata : Soft clayey
Abutment Foundation Type : Open
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : RCC counterfort type
Pier Type : RCC Solid

Protection Work

Bank Protection Left Side of Up-stream : no protection work provided
Bank Protection Right Side of Up-stream : no protection work provided
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided