Bridge (ID- 1853 ) Inventory Report

70 Mtr Span suspension Bridge at Dwali KPG Track Root On Chainage 29.000 of Dali Kafni glesiar bridle road : 274

Data Yet Not Finalized

Last Rated On 22 Feb 2025

Rating 8.49%

Categorized As

XXXXX on XX-XX-XXXX

In District : Bageshwar Under Division : CD Kapkot

General

Bridge Type : Pedestrain Bridge
Structure No : 29/1
Feature Intersected : Pindar River Dwali
Name of Bridge : 70 Mtr Span suspension Bridge at Dwali KPG Track Root
Nearest Town : Dwali
Latitude (Northing) : 30.17922900
Longitude (Easting) : 79.99539500
Construction Year : 2022
Inventory Year : 2022

Geometric

Overall length (in meter) : 60.00
Total No of Span : 1
Maximuam Span (in meter) : 60.00
Span Arragment : 1x60
No of Lane : 1.000
Overall Width (m) : 1.800
Carriageway Width (m) : 1.800
RS Footpath Width (m) : 0.000
LS Footpath Width (m) : 0.000
Approch Width i/c Shoulders (m) : 1.800
Gradient (%age) : 7
Skew Angle (degree) : 0.00
Radius of Curve in Plan (if Any) : 0.00

Design Data

HFL Highest Flood Level : 2703.500
OFL Ordinary Flood Level : 2701.000
LWL Low Water Level : 2700.000
Design Velocity (m/Sec) : 5.00
Design Discharge (Cumecs) : 1500.00
Soffit Level at Centre : 2706.500
Road Level at Centre : 2707.000
Design Scour Level at Pier :
Design Scour Level at Abutments :
Exposure Condition : Moderate
Seismic Importance factor : 0.0
Design Loading : Footpath Live Load
Load Rating : Footpath Live Load

Super-Structure

Superstructure Type : Suspension
Superstructure Material : Steel
Wearing Coat Type : Other
Expension Joint Type : Not Provided
Railing/Crash Barrier type : other
Bearing type : Not Provided

Sub-Structure

Founding Strata : Rocky
Abutment Foundation Type : Raft
Pier Foundation Type : NA
No of Piers : 0
Abutment Type : Stone Masonry
Pier Type : NA

Protection Work

Bank Protection Left Side of Up-stream : Plum Concrete Block
Bank Protection Right Side of Up-stream : Plum Concrete Block
Bank Protection Left Side of Down-stream : no protection work provided
Bank Protection Right Side of Down-stream : no protection work provided
Floor Protection on Up-stream : no protection work provided
Floor Protection on Down-stream : no protection work provided
Tratment for Corrosion Protection (if any) : no special treatment provided